| |
Sheridan Installations
|
|
|
| |
|
|
|
|
This feature install was sold by Key
Enterprises, a trained and certified Sheridan bleacher and platform sales crew.
The job was installed by Turnkey Installations in November 2009. The project at
Memorial High School in Port Arthur, Texas includes 13 row, 10 row and 6 row
electrically operated bleachers and, 7 row and 5 row fixed bleachers. The
bleachers are equipped with plastic seats with school letters inlay.
|
|

  
|


|
French Fieldhouse - Ohio State University
This feature install is another by Buckeye Bleacher Repair Inc.
from Sunbury, Ohio. This eight row manual bleacher was installed at the
French Fieldhouse at Ohio State University. The pictures show the varied states
of install, including several pictures of the free-standing understructure
before the wood deck was installed.
Buckeye is a trained and certified dealer and
installer of Sheridan Retractable
Bleachers.
 
 
 
|


|
This feature install was sold by Key Enterprises, a trained and certified Sheridan
sales and installation team, located in San Antonio, Texas. Their Turnkey
Installations crew installed this indoor poolside bleacher at Spring Branch -
Natatorium in Houston, Texas.
The
bleacher is seven rows, manually operated, featuring plastic seats, permanent
ADA cutouts, galvanized understructure, marine grade lumber and stainless steel
hardware. Sheridan's also includes drain holes so that any water can run off of
the decks.
Just
one of many fantastic installs by this group.
|
|
This
feature installation was done by Raymond Sports LLC and installed at Riffa Views
School in the Kingdom of Bahrain, an Arabic island country in the Persian Gulf.
Local Bahrain manpower was used to install the bleachers.
The
project was sold by C.G. International, a trained and certified Sheridan dealer.
Cliff Gillespie has been selling our product line in the Middle East for the
past 20 years.
This
is a small manually operated bleacher with two sections, four rows, and 75
seats.
Any
interested enquires from the Middle East can contact C.G. International at cgeintl@aol.com
|

|
These
retractable bleachers at the Cathedral of Praise Academy were installed in March
2009 and took ten days to complete. There are two banks of 11 rows, both
electrically operated and both over 90 feet long. The project included mandatory
recoverable handicap seating, column cut-outs, custom rails and plastic seats
with the inlay initials of the school, Cathedral Academy (C A).
The
install was performed by the in-house install crew of Office Church School
Supply Co. who are an authorized dealer of Sheridan Seating Inc.
Office
Church School Supply Co. is located in Sumter, SC and can be contacted at
803-773-7226.
 
 

|
|
| |
This installation is by S L Installations, Inc. of Elma, New York.
S
L Installations, Inc. is a trained and certified Sheridan Dealer in upper New
York state. Head installer,
Mike Ciurzynski,
and S L Installations, Inc. are trained and certified Sheridan Installers of
Telescopic Bleachers and Platforms.
The
project consisted of 2 banks of 12 row electrically operated bleachers at Hutchinson Technical High School in Buffalo, New York.
As you can see in the photographs at right, the vision for the
fans in the upper rows is impaired by the pilaster posts.
These posts were reduced in size to improve the sight lines (see photos
below).
Potential
customers needing service or sales of retractable platforms can contact S L
Installations, Inc. at 716-805-4040 or slinstallations@adelphia.net
|


|
|
| |
Finished install with
reduced pilasters |
|
|
 |
|
|
This
feature installation is by Buckeye
Bleacher Repair Inc. from Sunbury, Ohio.
The
installation at Brookside
High
School
in Sheffield Village,
Ohio
was completed in October 2007.
Buckeye
Bleacher Repair Inc.
is a trained and certified Sheridan Dealer and Installer of Telescopic Bleachers
and Platforms.

|

|
| |
|
|
|